SB 721 deadline has passed. Penalties run $100–$500/day per building — schedule your inspection today. SB 721 past due Get compliant 

Licensed California Contractor · CSLB #1060736 · Insured & Bonded

Decks Balcony Request an Inspection

Ground Level Deck Design · CSLB #1060736

Commercial Ground Level Deck Design in California

We design ground level, floating and platform decks for apartment communities, condominiums and HOA properties across the Bay Area, Central Valley, and Sacramento, with layouts for patios, courtyards and amenity areas. A deck close to the ground usually needs no guardrail, but its frame sits where wood stays wet the longest. Our ground level deck plans start with what happens under the boards: how far the frame stays from the soil, which lumber it is made of, how the ground drains and how air gets in.

CSLB-licensed #1060736 Apartment, condo & HOA specialists Clearance, lumber and drainage drawn for every low deck Designed and built by one contractor
  • CSLB #1060736 Licensed California contractor
  • 9+ yrs Designing and building decks
  • Low decks drawn right Clearance, lumber and drainage on every plan
  • Commercial & HOA Apartments, condominiums & HOA communities

01 Why it matters

The lower the deck, the more its design is about the space underneath

The American Wood Protection Association’s standard calls for ground-contact pressure-treated lumber where a part is less than six inches from the ground, at risk of poor air circulation or poor drainage, or likely to stay in contact with plants or leaf litter. A deck one step above a courtyard often meets several of those conditions at once. Lumber rated only for above-ground use is not made for them.

So the plans for a ground level deck start below the boards. The framing near the soil is specified in ground-contact lumber. The ground under the deck is graded away from the building and covered, usually with landscape fabric and gravel, so it drains and does not grow plants. The open sides are closed with a slatted skirt that keeps leaves out and lets air move through. Posts and footings keep the frame off the soil, and the deck stands clear of the building wall.

Floating decks, which stand free of the building, have a separate rule. California’s residential code lets a free-standing deck rest on precast concrete pier blocks without footings only when its joists bear directly on the blocks, it is no larger than 200 square feet, and its walking surface is no more than 20 inches above grade. That code covers houses and townhouses. Apartment and condominium buildings outside its scope are designed under the California Building Code, which sets footings at least 12 inches below undisturbed ground and has no pier-block exception. On those properties, floating deck design starts from footings.

A low deck needs no railing, but its frame sits where wood stays wet longest. The design decides how that frame is kept dry.
Ground level composite deck in a California apartment courtyard, one step above decomposed granite, with a slatted skirt for airflow and a gravel strip along its base

02 The D&B difference

What we design under a low deck

01

Lumber matched to its distance from the soil

Framing that is close to the ground, poorly ventilated, or hard to replace and important to the structure is specified as ground-contact rated lumber. The rating is written on the drawings for each member.

02

Ground graded and covered before framing

The soil under the deck is shaped to fall away from the foundation and covered so it drains and stays free of plants. Where water collects along the wall, a gravel strip is drawn in.

03

Air in, leaves out

Skirts are drawn with gaps between the slats, and the frame is kept off the soil, so air can reach the underside of the boards and the joists.

04 How a project runs

How a ground level deck project runs

  1. 01

    Assessment

    A free property assessment, scheduled within a week. We check the height from door thresholds to the ground, how water runs across the site, irrigation near the deck area and the soil.

  2. 02

    Layout

    Deck outline, height, steps and access, built-in benches and planters.

  3. 03

    Under-deck design

    Clearance to the soil, AWPA use-category rating for each member, grading, fabric and gravel, skirt and airflow.

  4. 04

    Drawings

    Ground level deck plans with framing, footing and under-deck details, and calculations from a licensed structural engineer we work with.

  5. 05

    Permit

    We confirm with the building department whether a permit is required and handle it where one is.

  6. 06

    Construction

    Grading and ground cover first, then footings, framing, decking and skirt, built by our crew.

05 Scope

What our low deck design covers

Under the deck Framing Edges and surface Drawings

Pressure-treated framing member resting directly on a line of precast concrete deck blocks set on compacted gravel
  • Ground graded away from the building foundation
  • Landscape fabric and gravel over the ground under the deck
  • Gravel strip along the wall where water collects
  • Irrigation kept away from the deck frame
  • Ground-contact pressure-treated lumber where framing is close to the soil or poorly ventilated
  • Footings sized for the site, or pier blocks where the residential code allows them
  • Frame kept clear of the building wall on free-standing decks
  • Ledger connection per CBC 1604.8.3 where a deck is attached to the building
  • Slatted skirts with air gaps along the open sides
  • Steps from the deck to paths and lawns
  • Decking chosen for a deck close to the ground, in wood or composite
  • Short plan sets for patio decks, and full sets with calculations for amenity and platform decks

Built to current code: CBC 1809.4 footing depth · CRC R507.3 free-standing deck exception where the residential code applies · CBC 1604.8.3 deck attachment · AWPA use categories for pressure-treated lumber · CBC 1015 guards where a deck stands more than 30 inches above grade · Title 24

06 Investment

How the price is set for a deck close to the ground

We price after a free assessment, and you receive an itemized quote within five business days.

Free on-site assessment
Fixed quote written scope, no obligation

What sets the number

  • Size of each deck and how many there are
  • Grading and ground cover under each deck
  • Footings or pier blocks, depending on the code that applies
  • Ground-contact pressure-treated lumber
  • Skirts, steps and built-in benches or planters
  • The decking chosen
  • Design only, or design with construction

Why the work under the deck is in the price: grading, fabric, gravel and ground-contact lumber add cost that no one sees once the boards are down. They are also what decides how long the frame of a low deck lasts.

Final pricing follows an on-site assessment. Request a free estimate — no obligation.

In the field

Platforms, flush decks and patio decks

Skirts with airflow, freestanding platforms, flush decks and simple patio decks at every unit.

  • Edge of a low composite deck: fascia board, slatted skirt with gaps between the slats and a band of river rock along the base
  • Freestanding platform deck in an apartment courtyard with built-in benches, a large planter and a shade umbrella, paths leading to it
  • Low-profile composite deck set almost flush with a decomposed granite path in a courtyard, with a planting cut-out around a young tree
  • Row of simple ground level patio decks at townhome units, each one step up from the walkway, with matching boards and slatted skirts
  • Low deck frame under construction against an apartment wall, part of the decking laid, a strip of gravel along the foundation
Low deck frame beside an apartment building on short posts and concrete footings, black landscape fabric and gravel covering the ground beneath

07 Project example

A recent set of ground level patio decks

Scope
Ground level patio decks at an apartment community
Under the decks
Ground graded away from the building, fabric and gravel
Framing
Ground-contact pressure-treated lumber on concrete footings
Result
Frames off the soil, with slatted skirts on the open sides

The old patio decks sat a few inches above bare soil, with plants growing up between the joists and no way for air to get underneath. We designed the replacements from the ground up: the soil under each deck regraded to fall away from the building and covered with fabric and gravel, the framing specified in ground-contact pressure-treated lumber on concrete footings, and slatted skirts along the open sides. The new decks keep the same height at the door, one step above the path.

The old decks had weeds coming up between the boards. The new ones sit over gravel, and the space under them stays clear. Property Manager · California apartment community

08 Case studies

Recent Projects, Documented

Real commercial properties — what the building needed, what we did, and what it delivered.

Browse all case studies

09 Client feedback

What property managers say

The old decks had weeds coming up between the boards. The new ones sit over gravel, and the space under them stays clear.
Property Manager California apartment community
The drawings showed the grading and the gravel under every deck, not only the boards. We could see where the money for the hidden work was going.
Community Manager Sacramento apartment community
The platform in the courtyard is one step up from the paths on every side. Residents walk onto it from any direction.
HOA Board President East Bay condominium association

10 FAQ

Questions about decks close to the ground

What goes into plans for a ground level deck?

The layout and height of the deck, steps and access, the framing plan with the AWPA use-category rating of each member, footings or pier blocks, the grading and ground cover under the deck, skirts and airflow, and the connection to the building if the deck is attached. For amenity and platform decks, the set also includes structural calculations.

Does a ground level deck need a railing?

Usually not. The California Building Code requires a guard where an open edge is more than 30 inches above the floor or ground below, measured within 36 inches of the edge. A deck one or two steps above the ground stays below that, so its edges can stay open.

What lumber is used for a deck close to the ground?

Ground-contact pressure-treated lumber wherever the American Wood Protection Association’s standard calls for it: less than six inches from the ground, at risk of poor air circulation or poor drainage, in contact with plants or leaf litter, or hard to replace and important to the structure. On a low deck, that often covers most of the frame.

Can you design a floating deck on deck blocks?

Where the residential code applies, a free-standing deck can rest on precast concrete pier blocks without footings if its joists bear directly on the blocks, it is no larger than 200 square feet and its walking surface is no more than 20 inches above grade. On apartment and condominium buildings designed under the California Building Code, footings go at least 12 inches below undisturbed ground, so floating decks there get footings instead of blocks.

Does a ground level deck need a permit?

California’s residential code exempts decks of up to 200 square feet that are no more than 30 inches above grade, not attached to the dwelling and not serving the required exit door. Larger decks, attached decks and decks on apartment buildings are handled by the building department under the codes that apply to them. We confirm the requirement with the city or county before work starts.

What is a platform deck?

A low, free-standing deck set in a courtyard or garden, reached by a step from the paths around it, usually with benches, planters or shade. Platform deck designs on apartment properties often serve as a seating area away from the buildings, and their footings are designed under the California Building Code.

How low can a low profile deck be?

As low as the framing, the clearance it needs from the soil and the decking manufacturer’s instructions allow. The lower the frame sits, the more of it needs ground-contact rated lumber and the more the grading and airflow under it matter. We set the height from the door threshold and the ground, and draw the clearance under the frame.

What happens to water under a deck close to the ground?

The ground under the deck is graded to fall away from the building, and the gravel cover lets rain soak in or run off instead of standing under the boards. Sprinkler heads are placed so they do not spray the frame. Where water collects along the foundation, a gravel strip carries it along the wall.

Are you a ground level deck designer near me?

We work across the Bay Area, Central Valley and Sacramento, with free property assessments scheduled within a week. Design, drawings, permitting and construction come from one CSLB-licensed contractor (#1060736). Call (916) 848-2728 and tell us the city and how many decks you are planning.

11 Start here

Get ground level deck designs for your property — free assessment in California

Tell us where the decks will go, roughly how high the door thresholds sit above the ground, and whether the decks are for each unit or shared. We schedule the assessment within a week and send an itemized quote within five business days.

CSLB #1060736 · 9+ years · Insured & Bonded · Commercial, multifamily & HOA properties across the Bay Area, Central Valley & Sacramento

Privacy controls

Cookie preferences

Choose which optional technologies may be used. Necessary tools remain active.

Change or withdraw permission any time using Cookie settings in the footer.

Closing does not save changes.

Your privacy choices

Opt out of the sale or sharing of personal information for advertising. You can still request a quote.

No account needed for this browser choice. Other privacy requests: see Privacy Policy.

📞
Call Now!