Deck Boards Replacement · CSLB #1060736
Commercial Deck Boards Replacement in California
Our crews take up and replace worn decking on balconies, decks, walkways and stairs at multifamily and HOA properties in the Bay Area, the Central Valley and Sacramento. Replacing deck boards across a whole deck is a different job from swapping a few: the old boards come off, the framing is open for the first time in years, and the new boards have to suit that framing.
- CSLB #1060736 Licensed California contractor
- 9+ yrs Re-decking occupied buildings
- Framing checked open Joists and hangers repaired before new boards
- Commercial & HOA Apartments, condominiums & HOA communities
01 Why it matters
Replacing decking boards opens three questions: the framing, the new material and the old boards
The first is the framing. With the old boards off, joist tops, hangers and the ledger can be checked along their full length. On our projects, water-damaged or loose framing is repaired before any new board goes down, because new decking is fastened to the same joists and would come off again to reach them later.
The second is the new material, which can change what the framing has to be. The California Residential Code requires plastic composite deck boards to comply with ASTM D7032 and to carry a label showing their allowable load and maximum span. Trex’s 2026 installation guide adds that its decking must span at least three joists and sets joist spacing by product in its span chart. Switching from wood to composite can mean adding joists between the old ones. On properties in a Fire Hazard Severity Zone, Section 504.7.3.2 of the 2025 California Wildland-Urban Interface Code also limits deck walking surfaces to listed materials, such as ignition-resistant material, exterior fire-retardant-treated wood or noncombustible material.
The third is the old boards. A Contractors State License Board bulletin explains that pressure-treated wood from demolished decks is pressure-treated wood waste in California: it may go only to landfills approved by the State Water Resources Control Board, and it may not be burned or chipped into mulch. Manufacturers stopped using CCA preservative for residential wood effective December 31, 2003, so pressure-treated boards on older decks may contain it.
New decking is fastened to the old joists, so we check them while they are open. The old pressure-treated boards go to an approved landfill.

02 The D&B difference
How we plan a full re-decking job
The framing is checked before new boards are ordered
On each deck, we lift sample boards along the ledger and over any soft spots before the quote. When the full decking comes off, every joist top and hanger is checked again.
The joists are set for the new boards
For composite, joist spacing follows the label and the manufacturer’s span chart. Where the old framing was built for wood boards at a wider spacing, new joists go in between.
Old boards are handled as pressure-treated wood waste
Removed pressure-treated boards are kept off the ground and covered on site, then hauled to a landfill approved for pressure-treated wood waste.
03 · Service Areas
Where We Work in California
Every city links to a dedicated local page — crews, recent projects and compliance details for that area.
Sacramento Metro
24 cities
East Bay
35 cities
North Bay
20 cities
Central Valley
16 cities
South Bay & Peninsula
30 cities
- San Francisco
- San Jose
- Santa Clara
- Sunnyvale
- Mountain View
- Palo Alto
- Cupertino
- Milpitas
- Los Altos
- Los Gatos
- Saratoga
- Campbell
- Gilroy
- Morgan Hill
- Redwood City
- San Mateo
- South San Francisco
- Daly City
- Menlo Park
- Burlingame
- San Bruno
- Foster City
- Pacifica
- East Palo Alto
- Millbrae
- Stanford
- Half Moon Bay
- Hillsborough
- Alum Rock
- North Fair Oaks
Don’t see your city? We likely still cover it — call (916) 848-2728.
04 How a project runs
How replacing deck boards runs, start to finish
-
01
Assessment
A free visit within a week. We measure each deck, lift sample boards and note the framing.
-
02
Quote
An itemized price within five business days: removal, haul-off, framing work, new boards, fascia and stairs on separate lines.
-
03
Removal
Old boards taken up deck by deck, cut ends and fasteners cleared from the joist tops.
-
04
Framing
Joists, hangers and ledger checked; repairs and added joists done before decking starts.
-
05
New decking
New boards fastened and gapped to the manufacturer’s instructions.
-
06
Close-out
Stair treads and fascia finished, the site cleared, and disposal records kept for the property file.
05 Scope
What our deck board replacement covers
Removal and disposal Framing under the new boards New decking

- Old, damaged and rotten boards removed across the deck
- Pressure-treated wood waste stored, hauled and disposed of at approved landfills
- Disposal records for the property
- Joist tops, hangers and ledger checked along their length
- Joists added where the new boards need closer spacing
- Water-damaged framing repaired before decking starts
- Wood or composite replacement deck boards
- Stair treads, risers and fascia replaced to match
- Railings reset or replaced where they come off with the boards
Built to current code: CRC R507.2.2 plastic composite decking where the Residential Code applies · California Wildland-Urban Interface Code 504.7.3.2 decking in Fire Hazard Severity Zones · CBC 1015 guards · Health & Safety Code 25230 pressure-treated wood waste · SB 721 and SB 326 requirements for exterior elevated elements
06 Investment
What makes up the deck boards replacement cost
We price each property after measuring the decks and checking the framing, with every cost on its own line.
What sets the number
- Deck area and number of decks, balconies and stairs
- The new board: species or composite line
- Removal and disposal of the old boards
- Framing repair and any added joists
- Fascia, stair treads and railing work
- Access, staging and work on occupied buildings
Why we do not quote a flat price per board: the labor cost to replace deck boards depends on what is under them. Two decks of the same size can need very different framing work, and that becomes visible once the old boards are up.
Final pricing follows an on-site assessment. Request a free estimate — no obligation.
In the field
Open framing, old boards out, new boards and stairs
Re-decking on multifamily properties, from removal to finished decks and stairs.
07 Project example
A recent re-decking of apartment balconies
The property planned new decking on every balcony. With the decking up, most framing was sound, but two joists were water-damaged where they met the ledger. We replaced those joists and their hangers, laid new boards with straight screw lines over each joist and hauled the old pressure-treated boards to an approved landfill, with the receipts kept for the property file.
They found two bad joists once the old boards were up and fixed them before the new decking went on. We got the landfill receipts too. Property Manager · California apartment community
09 Client feedback
What property managers say
They found two bad joists once the old boards were up and fixed them before the new decking went on. We got the landfill receipts too.
We switched to composite. They added joists first, and the new boards feel solid underfoot.
The quote split removal, framing and new boards, so we could see where the money went.
10 FAQ
Questions about replacing decking, materials and cost
When is it better to re-deck the whole deck instead of repairing a few boards?
When the boards are worn, checked or soft across most of the deck rather than in a few spots. Replacing all deck boards also opens the framing for a full check. When the damage is limited to a few boards, a repair is the smaller job.
What goes into the price of new decking?
The cost to replace deck boards follows the deck area, the new material, removal and disposal of the old boards, and any framing repair found once the decking is off. We give an itemized price after a free visit.
Is there a typical price per deck?
We do not publish one. Board material, framing condition, stairs, access and disposal vary from property to property, so we price each deck after seeing it.
Can new composite boards go on old wood framing?
Yes, if the framing is sound and the joist spacing matches the label and the manufacturer’s span chart. Where the joists are too far apart for the new boards, joists are added between them.
What do you do with the old boards?
In California, pressure-treated wood from demolished decks is pressure-treated wood waste. It may go only to landfills approved by the State Water Resources Control Board and may not be burned or chipped into mulch, so we haul it to an approved landfill.
What does it take to replace rotten deck boards?
We remove the rotten boards, and any soft or water-damaged joists and hangers under them are repaired before new boards go down.
Do deck boards have fire rules in California?
In Fire Hazard Severity Zones, Section 504.7.3.2 of the California Wildland-Urban Interface Code limits the walking surfaces of decks, porches, balconies and stairs to listed materials, such as ignition-resistant material, exterior fire-retardant-treated wood or noncombustible material. We check the property’s zone and what the local building department applies to the work before choosing boards.
Do you work in my area?
Yes, across the Bay Area, Central Valley and Sacramento for apartment, condominium and HOA properties. Call (916) 848-2728.
11 Start here
Replace deck boards across your property — get a board-by-board price in California
Send the number of decks, balconies and stairs, rough sizes and photos of the decking and underside. We visit within a week, lift sample boards, and send the itemized price within five business days.
CSLB #1060736 · 9+ years · Insured & Bonded · Commercial, multifamily & HOA properties across the Bay Area, Central Valley & Sacramento