Balcony & Walkway Waterproofing — 12 Elevated Elements, Rio Linda

The coating still covered the middle of every walkway. It had given up at the edges, and the edges are where the beams are.

Rio Linda, CATwo-story garden apartment communityCompleted Q2 2026
Two-story Rio Linda apartment building with rebuilt balcony framing, new fascia and black aluminum guardrails after waterproofingWaterproofing

Project facts

Property
Two-story garden apartment community
Units
16
Elevated elements
12 balconies plus the connecting walkways and stair landings
Client
Owner / property management company
Scope
Exploratory openings at the marked elements, removal of the failed deck coating and plywood, replacement of rotted joists, beam ends and rim framing, new connection hardware, new plywood, new waterproof deck coating system
Timeline
6 weeks
Completed
Q2 2026
Budget range
$85k–$120k

01 The situation

The challenge

From the walking surface the coating looked serviceable. It had failed where nobody walks — along the outside edge, where the deck meets the rim joist and the painted fascia band. Water had been getting in there long enough that the paint was holding the shape of wood that was no longer there. Behind the fascia on the beam marked E34, the timber came away in fibrous handfuls; the beam marked B still had its steel connector plate bolted to the post, but the bolts through it were rusted and the wood around them had gone soft. None of that reads from the balcony. All of it reads the moment the edge is opened.

02 Execution

What we did

The openings set the sequence, not the original bid:

Opened the elements marked in the inspection report first and traced how far the rot ran back from each edge before pricing the rest

Stripped the failed coating and the plywood down to framing, and cut every joist and beam end back to sound wood

Sistered and replaced the framing, rebuilt the rim, renewed the beam-to-post connections with new hardware, and laid new plywood with positive slope away from the wall

Applied the waterproof deck coating system across balconies, walkways and landings, turned up the wall and lapped out over the rim to seal the edge that failed last time

03 Outcome

The result

12balconies and walkways re-framed and re-waterproofed
3element types covered — balconies, walkways, stair landings
6 wksfirst opening to final coat

Every elevated element on the property now carries the same coating system, applied over framing that was cut back to sound wood rather than coated over. The edge detail — the part that failed last time — is turned up the wall and lapped out across the rim, so water that gets past the surface has somewhere to go instead of somewhere to sit. The SB 721 items closed across the whole property in one pass, including the elements the sample never opened.

Results at a glance

  • 12 balconies, connecting walkways and stair landings re-waterproofed under one coating system
  • Rotted joists, beam ends and rim framing cut back to sound wood and replaced
  • Corroded beam-to-post connection hardware renewed while the framing was open
  • Deck edges and wall transitions detailed so the coating does not fail at the perimeter again

What the client received

  • SB 721 closure covering every elevated element, not only the sampled ones
  • Coating manufacturer warranty plus our workmanship warranty
  • Photo record of each opening, keyed to the element numbers in the inspection report
  • Framing repair log showing what was replaced at each balcony and walkway
  • Maintenance schedule running through to the next inspection cycle

Transformation

Before & After

The walkway along the upper units

Rio Linda apartment walkway with the decking removed, exposing the joists before framing repairs
Opened up
Rio Linda apartment walkway finished with a grey textured waterproof deck coating
After

The lower walkway from the courtyard

Cracked and delaminating deck coating over a rotted rim joist at a Rio Linda apartment walkway before repair
Before
Two-story Rio Linda apartment building with rebuilt balcony framing, new fascia and black aluminum guardrails after waterproofing
After

“The report marked a handful of beams. I assumed the rest were fine, because they looked the same. They did look the same — that was the problem.”

Property Manager16-unit community, Rio LindaSB 721 · Waterproofing

Free property assessment

Want results like these on your property?

Tell us about your deck or balcony program — a licensed contractor calls back the same business day with clear next steps.

 Or call (916) 848-2728

CSLB #1060736 · Insured & bonded · SB 721 / 326 specialists

Free Property Quote

Get your free property assessment

Same-day callback · No obligation

Property Quote — Multi-step (hero)
📞
Call Now!