Case Study · SB 721 · CSLB #1060736

Elevated Walkway Rebuild & Waterproofing — 96-Unit Apartment Community, Citrus Heights

The walkways weren't leaking from the top. The low-slope roof above them had lost its edge metal and its membrane, and everything underneath was taking the water.

Citrus Heights, CATwo-story garden apartment communityCompleted Q3 2026
Rebuilt second-floor apartment walkway in Citrus Heights with new grey waterproof deck coating and freshly painted ceiling and postsWaterproofing

Project facts

Property
Two-story garden apartment community
Units
96
Elevated elements
8 walkway runs and the low-slope canopy roofs above them
Client
Owner / property management company
Scope
Low-slope roof rebuild with new edge metal, walkway deck coating, soffit and beam repairs, repaint
Timeline
6 weeks
Completed
Q3 2026
Budget range
$180k–$220k

01 The situation

The challenge

The first drone pass answered the question before anyone opened a wall. The low-slope roof over the top-floor walkways had lost long runs of edge metal — whole sheets peeled back and lying loose on the membrane — and the membrane underneath was patch over patch. The rest of the story was written on the ceiling below: staining across the soffit boards, paint lifting off the beams, dark seams where water had been tracking along the framing. The walking surface was worn down to bare concrete and needed a coating, but coating it on its own would have sealed the deck and left the source running.

02 Execution

What we did

We started above the problem and worked down to it:

Flew the roofs and walkways first, mapping every failed seam and loose run of edge metal before the work was priced

Rebuilt the low-slope canopy roofs — new membrane over prepared substrate, new edge metal and fascia along the full length

Replaced water-damaged soffit boards and beam trim, then primed and repainted the ceilings, beams and posts

Coated the walkway decks with a reinforced waterproof system, sealed at the walls and carried out over the new edge

03 Outcome

The result

8walkway runs rebuilt and coated
900 lfof new edge metal and fascia
6 wksdrone survey to final coat

Water now leaves the building the way it was meant to — off a sound membrane, into new edge metal, and clear of the framing. The decks are coated, the soffits and beams that had been soaking up runoff for years are replaced and repainted, and the owner holds an aerial survey of the property from before and after the work rather than a stack of coating invoices with no explanation attached.

Results at a glance

  • Low-slope canopy roofs rebuilt with new membrane and full-length edge metal
  • Water-damaged soffit boards and beam trim replaced across 8 walkway runs
  • Walkway decks coated with a reinforced waterproof system
  • Aerial survey documenting conditions before and after the work

What the client received

  • Before-and-after aerial survey of every roof and walkway on the property
  • Manufacturer warranty on the roof and deck systems plus our workmanship warranty
  • Photo record of the soffit and framing repairs before they were closed up
  • Supporting documentation for the walkways at the next SB 721 cycle
  • Re-coat and inspection schedule covering both the roofs and the decks

Transformation

Before & After

The canopy roof above the walkway

Aerial view of a failed low-slope walkway roof in Citrus Heights with edge metal peeled loose from the membrane
Before
Aerial view of the rebuilt low-slope walkway roof with new membrane and edge metal
After

The walkway deck

Worn bare concrete walkway with weathered posts and stained ceiling before waterproofing
Before
Rebuilt second-floor apartment walkway in Citrus Heights with new grey waterproof deck coating and freshly painted ceiling and posts
After

The walkway ceiling

Water-stained soffit boards and peeling paint on the beams above an apartment walkway
Before
The same soffit after damaged boards were replaced and the ceiling repainted
After

“We had been re-coating the walkways every few years and could not work out why the ceilings kept staining. They flew the roofs on day one and showed us the water was coming from above.”

Property Manager96-unit community, Citrus HeightsSB 721 · Waterproofing

Free property assessment

Want results like these on your property?

Tell us about your deck or balcony program — a licensed contractor calls back the same business day with clear next steps.

 Or call (916) 848-2728

CSLB #1060736 · Insured & bonded · SB 721 / 326 specialists

Free Property Quote

Get your free property assessment

Same-day callback · No obligation

Property Quote — Multi-step (hero)
📞
Call Now!