SB 721 deadline has passed. Penalties run $100–$500/day per building — schedule your inspection today. SB 721 past due Get compliant 

Licensed California Contractor · CSLB #1060736 · Insured & Bonded

Decks Balcony Request an Inspection

Deck repair and replacement for property managers

Decks, stairs and walkways at California apartment, HOA and commercial properties, repaired or rebuilt to your inspection report and scheduled around residents.

Managing balconies? California balcony law for property managers

Coastal apartment building in Daly City with a large shared elevated deck under rebuild, ocean in the background
Daly City · Shared deck restoration, residents in place

Which decks California law covers

SB 721 and SB 326 apply to decks, stairs, landings and walkways as well as balconies. An element is covered when its walking surface is more than six feet above ground and it relies on wood for support.

SB 721

Multifamily rentals

Decks, stairs, walkways and balconies at buildings with three or more multifamily units.

Inspection timing

Every 6 years

Initial deadline: January 1, 2026

Who can inspect

Licensed architect or civil/structural engineer; eligible contractors and certified inspectors may also qualify.

SB 326

Condominium associations

Association-maintained decks, stairs, walkways and balconies in buildings with three or more attached units.

Inspection timing

At least every 9 years

Initial deadline: January 1, 2025

Who can inspect

Licensed architect, civil engineer or structural engineer.

Ground-level and patio decks fall outside both laws; local building codes and railing rules still apply. Initial deadlines shown apply to existing buildings; exceptions and stricter local rules may apply.

After the inspection

Inspection report lists deck repairs?

Send us the report. We price it item by item, separate urgent items from work that can be scheduled and pull the permit. Under SB 721, the permit application is due within 120 days of receiving the report.

Deck repair services
Weathered decking on a townhome deck in a San Ramon community, before the rebuildNew pressure-treated decking on the same San Ramon townhome deck, after the rebuild
San Ramon · Community deck surface, before and after the rebuild

Deck maintenance for property managers

Water and loose connections are behind most deck repairs. Regular checks keep small items small and give the next inspector a clear history.

Between inspections

Walk every deck and stair at least once a year and after winter storms. Look for soft or split boards, loose railings, corroded fasteners and joist hangers, water staining at the ledger and debris blocking drainage. Log each item by building and deck.

Working around residents

Deck work closes outdoor space residents use every day. Give written notice of dates and affected units, keep a safe route to every entrance and tell residents what to clear off their decks before work starts.

Repair or replace

Once the boards come up, the framing decides. Sound joists, beams and ledgers can carry new decking; water damage running through the framing usually makes a rebuild the better use of the budget. Phasing building by building spreads the cost across budget cycles.

California

California deck and balcony law guides

Apartment buildings

SB 721

SB 721 guide

Condominium associations

SB 326

SB 326 guide

Confirm applicability with a qualified inspector. Repairs do not replace a required inspection.

Property manager
FAQs

Old decking removed and new pressure-treated framing with galvanized hardware during a community deck rebuild in San Ramon
Framing and hardware details
Does SB 721 apply to the decks at our apartment building?

It applies at buildings with three or more multifamily units when a deck, stair, landing or walkway has a walking surface more than six feet above ground and relies mainly on wood for support. Ground-level and patio decks fall outside the law. Confirm each element with a qualified inspector.

Our inspection report lists deck repairs. What are the deadlines?

Under SB 721, the owner applies for a building permit within 120 days of receiving the report and completes the repairs within 120 days of permit approval, unless the city grants an extension. Elements flagged as an immediate hazard are closed off right away. Local rules can be stricter.

Can you price the repairs from our engineer’s report?

Yes. Send the report and we price it item by item, check the findings on site and mark anything that has to be opened up to confirm. You get a written proposal the owner or board can compare with other bids.

Should we repair the deck or replace it?

It depends on the framing. If joists, beams and ledgers are sound, new decking and railings are usually enough. If water damage runs through the structure, a rebuild costs less over time. We show photos and figures for both options before anyone decides.

Can the work be split across more than one budget year?

For items that are not urgent, yes. Immediate hazards and report deadlines do not wait; the rest of the proposal is phased so the owner or board can approve the first phase now and schedule the remainder.

Request a quote

Tell us about the property and its decks.

Step 1 of 3Property

Property details

Property Quote — Multi-step (hero)

* Required. Next: your project, then contact details.

Apartment walkway with new composite decking along the units in Menlo Park
Menlo Park · Apartment deck, walkway and stair replacement

American Building Development

CSLB #1060736

  • NARI — National Association of the Remodeling IndustryMember
  • NARPM — National Association of Residential Property ManagersSacramento Chapter
  • James Hardie Alliance Select ContractorSelect Contractor Siding
  • BBB Accredited BusinessA+ rating

Already have an inspection report?

Privacy controls

Cookie preferences

Choose which optional technologies may be used. Necessary tools remain active.

Change or withdraw permission any time using Cookie settings in the footer.

Closing does not save changes.

Your privacy choices

Opt out of the sale or sharing of personal information for advertising. You can still request a quote.

No account needed for this browser choice. Other privacy requests: see Privacy Policy.

📞
Call Now!