Case Study · SB 721 · CSLB #1060736
Coastal Shared Deck & Walkway Restoration — Daly City
A large shared elevated deck on the coast — surface, framing and connections all degraded by years of salt air — rebuilt with corrosion-resistant hardware while residents kept access to their units.
Deck RepairProject facts
- Location
- Daly City, CA
- Service
- Repair & Restoration
- Property
- Coastal multi-unit apartment property with a large shared elevated deck and second-floor walkway
- Elevated elements
- ~4,500 sq ft shared deck + walkway
- Client
- Property owner / management company
- Scope
- Deck surface replacement · structural connection restoration · corrosion-resistant hardware
- Timeline
- 7 weeks · phased, residents in place
- Completed
- Q3 2026
- Budget range
- $120k–$160k
01 The situation
The challenge
Years of salt air had taken the whole assembly at once. On the surface, the shared deck had gone silver-gray and brittle, with boards splitting and whole sections gone soft — one had already opened into a hole down to the joists, right where residents walked to their doors. Underneath was the real concern: at the post-to-beam connections carrying the deck, the beam ends had rotted black and the galvanized brackets had corroded through, with posts checking where they met the beams over the concrete piers.
The deck is a shared route and a shared amenity — it fronts a row of units and connects to the second-floor walkway — so it couldn’t be fenced off and abandoned for two months. And a like-for-like repair would have failed the same way on the same timeline: the same standard hardware in the same salt air. The property needed the deck brought back sound and detailed to last on the coast, without cutting residents off from their doors.
02 Execution
What we did
We rebuilt the deck as a marine-condition assembly, section by section:
Isolated one section at a time behind barrier, kept the rest of the deck and the walkway in use, and removed the failed decking to expose the framing and connections
Cut back and replaced rot-damaged beam ends and posts, and restored every post-to-beam and post-to-pier connection with new corrosion-resistant (hot-dip galvanized) structural hardware
Replaced the deck surface with new pressure-treated boards set with proper spacing and fall, so water and salt drain off instead of sitting in the joints
Sealed the new surface and exposed timber, and walked each section before it reopened to residents
03 Outcome
The result
The shared deck came back sound from the piers up, with every connection re-detailed in corrosion-resistant hardware chosen for the coast — so the parts that failed first are now the parts built to last longest. The elevated elements were brought back into SB 721 compliance, residents kept access to their doors and the walkway throughout, and the property has a documented record of what was found and what was replaced under every board.
Results at a glance
- Shared deck surface replaced over restored, sound framing
- Every post-to-beam and post-to-pier connection rebuilt in corrosion-resistant hardware
- Elevated elements brought back into SB 721 compliance
- Residents kept access to units and walkway throughout
What the client received
- SB 721-aligned repair documentation for the property file
- Photo record of the framing and connections found under the deck
- Corrosion-resistant hardware detail specified for the coastal environment
- Sealed surface with a workmanship warranty
Transformation
Before & After
Deck surface


Post-to-beam connection


On site
Project Photos



“The old deck rotted because it was built for anywhere, not for the coast. They rebuilt it with the right hardware and never once blocked our residents from their doors.”
Keep exploring
Related Projects
Deck RepairElevated Restaurant Dining Deck Restoration — SaratogaA multi-level hillside dining deck taken from failing boards and moisture-damaged connections back to a sound, sealed structure…View case study
Deck ConstructionCommunity-Wide Elevated Deck Replacement — San RamonEvery elevated deck across a hillside townhome community rebuilt to a single spec in one managed program —…View case study
WaterproofingBalcony & Walkway Waterproofing — 12 Elevated Elements, Rio LindaThe coating still covered the middle of every walkway. It had given up at the edges, and the…View case study
Balcony RepairSB 721 Balcony Ledger & Framing Rebuild — 72-Unit Apartment Community, Gilroy24 stacked balconies reframed where they attach to the building and where they rest on their posts —…View case study
Deck RepairTrex Deck, Walkway & Stair Replacement — 12-Unit Apartment Community, Menlo ParkResidents walked the same tired wood the whole way from the parking lot to their front door —…View case study
Balcony RepairBalcony & Elevated Walkway Replacement — 24 Balconies, LodiEvery balcony and second-floor walkway rebuilt from the framing up — new waterproof deck system, new code-height guardrails,…View case study