Case Study · SB 721 · CSLB #1060736
Elevated Deck Reconstruction & Waterproofing — 24 Balconies, Sacramento
Open board decks sitting directly over enclosed garages. Every gap between the boards was a route for water into the framing — so we rebuilt them as sealed, sloped decks instead of replacing boards again.
Deck RepairProject facts
- Location
- Sacramento, CA
- Service
- Repair & Restoration
- Property
- Two-story residential complex, units over enclosed garages
- Units
- 24
- Elevated elements
- 24 entry balconies and the exterior stairs serving them
- Client
- Owner / property management company
- Scope
- Deck tear-off, framing repairs, solid sheathing and slope, waterproof deck system, new guardrails, repaint
- Timeline
- 7 weeks
- Completed
- Q3 2026
- Budget range
- $130k–$165k
01 The situation
The challenge
The decking was doing exactly what open board decking does — passing water straight through. Every gap between boards, every knot that had dropped out and every rusted screw hole delivered runoff onto the framing underneath instead of off the edge of the deck. The boards themselves had gone grey and splintered, and the guardrails were rusting where their base plates met the surface. Replacing the boards like for like would have bought a few years and rebuilt the same detail that caused the problem. What the building needed was a deck that sheds water rather than filters it.
02 Execution
What we did
Each balcony came off completely before anything went back on:
Stripped the board decking and the guardrails, and inspected the joists, beams and rim on every balcony
Replaced damaged framing, then sheathed the decks solid and set the slope to carry water to the edge
Installed a reinforced waterproof deck system with a textured non-slip finish, turned up at the walls and out over new edge metal
Set new powder-coated aluminum guardrails and repainted the framing, fascia, posts and stairs
03 Outcome
The result
Each balcony is now a continuous surface that drains to its own edge instead of a set of boards that hand water to the framing. The undersides — joists, beams and fascia that had been catching runoff for decades — are repaired and repainted, the guardrails are new and load-tested, and the balconies and the stairs serving them were closed out together rather than as two separate line items.
Results at a glance
- All 24 balconies rebuilt from open board decking to a sealed, sloped deck
- Damaged joists, beams and rim framing replaced and the undersides repainted
- New powder-coated aluminum guardrails on every balcony
- Water no longer passes through the deck into the garages below
What the client received
- SB 721 findings closure with photo documentation of every framing repair
- Manufacturer warranty on the deck system plus our workmanship warranty
- A record of what was found under each deck once the boards came off
- One repeated detail across all 24 balconies and their stairs
- Re-coat and inspection schedule for the next cycle
Transformation
Before & After
The entry balcony


The deck surface


The underside of the structure


On site
Project Photos





“We had been replacing boards one balcony at a time for years. They showed us the water was going through the deck, not sitting on it, and rebuilt them so it stops there.”
Keep exploring
Related Projects
WaterproofingBalcony & Exterior Stair Waterproofing — 32-Unit Multifamily Community, SacramentoThe rot wasn't out at the edge — it was where the deck met the wall. We stripped…View case study
Balcony RepairBalcony & Elevated Walkway Replacement — 24 Balconies, LodiEvery balcony and second-floor walkway rebuilt from the framing up — new waterproof deck system, new code-height guardrails,…View case study
WaterproofingElevated Walkway & Balcony Waterproofing — 40-Unit Apartment Community, Rio LindaDry rot had opened holes straight through the walkway decks. We shored the spans, rebuilt the framing underneath,…View case study
WaterproofingBalcony Waterproofing — Blue Apartment Building, VacavilleThe coating had not cracked. It had worn thin exactly where the debris line sat — along the…View case study
WaterproofingRooftop Terrace Membrane & Deck Replacement Over Occupied Units — Walnut CreekA rooftop terrace leaking into the units below, taken up to the roof surface — new membrane turned…View case study
WaterproofingBalcony & Walkway Waterproofing — 12 Elevated Elements, Rio LindaThe coating still covered the middle of every walkway. It had given up at the edges, and the…View case study